16.5. Flow Test

Overview

The purpose of the test is to verify that enough pressure can be achieved at the most remote hose connection when the standpipe operates at system demand. 

16.5.1. Scheduling

The only way to perform the test is after a Violation has been issued. Even if the Sprinkler & Standpipe Company knows that the flow test is due, one can’t be performed without the FDNY first issuing a violation. 

16.5.2. Inspection

A flow test must be conducted every 5 years on automatic standpipe systems on all Class I and Class III standpipe systems to verify that the required flow and pressure are available at the hydraulically most remote hose valve outlet(s) wile flowing the standpipe system demand 

16.5.3. Filing

The FDNY Inspector retains the results of the test and provides a copy to the building which must retain a copy to prove compliance of the issued violation. 

Our experts are ready to answer any questions you may have about the compliance process.

Whether you need to know more about testing requirements or what happens if you miss a critical deadline, we will help you find the information you're looking for. We developed SmartCompliance to automate the entire compliance process, and we know that the NYC regulatory landscape is tricky, so let us help you today.

Speak to an Expert

Discuss this Criteria

Have a question? Want to share your facility's insight? Leave a comment below!

1. Backflow Preventer
2. Boiler
3. Building
5. Elevator
6. Escalator
7. Facade
  • 7.1. FISP
    • 7.1.1. Scheduling
    • 7.1.2. Inspection
    • 7.1.3. Filing
8. Fire Alarm
9. Fire Extinguisher
10. Fuel Tank
11. Generator
12. Gravity Tank
13. Pool
14. Smoke Detector
15. Sprinkler System
16. Standpipe System
17. Hood Suppression